In case the condenser in supported on springs and the condenser neck is directly welded tothe turbine cylinder exhaust hood, then the final lifting and installation of the condenser onpermanent support shall be carried out only after final installation of the casing. It shall beensured that all spring supports are evenly loaded and the gap between the condenser andthe spring supports is within +/- 1.0 mm. Suitable adjusting bolts shall be used to further liftthe condenser till the clearance between condenser neck and turbine. Exhaust hood issuitable for welding and such clearances shall not exceed 3.0mm. The welding of the aboveconnection shall be performed as called for as prescribed in this volume above. Suitablemachined permanent spacers shall be provided and the condenser load shall gradually betransferred on these spacers from temporary bolts.