With the completion of the installation of convection, stack structure and stack, remove and seal the transportation rods present on each longitudinal side of the convection modules and radiant shield module, wrapped the nozzles with loose CFB 128Kg/m 3, 1260℃, 12,5mm thickness and close it with plugs.