The base of the derrick drawwork unit (DDU) the derrick subbase must be made in a parallelogram-integral telescopic lifting design, in maximum factory readiness (quick-detachable connections of electrical cable products, communications and mortar lines, block-modules with each other, ensuring reliable tightness of the connections.