Produced on 28/jan:Main board:385 pc (top /bot) Until AOI.Main issues: - 5 board with missing components. (lack of material / will request more from wh). - rf conn. Missligned. 35 pcs (will update number tomorrow after inventory). CCBR need spec for missalignment. How much is still ok.-Ict: 3 boards tested and ok.-Back cover label: log system tested in MIS room: ok. Printing ok/ scanning ok. (barcode 5mm height).Plan for 29/:-Rework missing components and defect on smt.-Ict testing: all pcs.-Assembly and function testing. (still need to check with tairo and mfg for man power and time in the line).-back cover label in line testing.-Discuss with tp team: board id / pcba aux / machine id labels. Lay out, pn, purchasing /local development.-shipping injection samples.