Issue 1 : The dust is not cleaned after cuttingAction Plan : For the defects, removed the dust by air blower. And require operators that clean dust after cutting Issue 2 : QC and AQL inspectors did not accurately catch the acceptance degree of soiling.Action Plan : Re-training for QC and AQL