4 INSTALLATION The Upstream Film Processing System requires connection to the proper power and air (pneumatic) for operation. The intake/heater port on the top of the enclosure must be connected to a clean air source. The exhaust/blower in Zone 1 needs to be connected to the facility’s exhaust duct as described in Section 4.8. and a clean air source connected to the purge/blower in Zone 2. The system will require additional connections between the safety cabinet and the main system to complete the installation. These additional connections will be made by the Customer, according to local, state, and federal codes, rules, and/or regulations. An additional provision is made for a facility air sweep or flow switch from a facility ventilation fan to the Safety Electrical Cabinet. Refer to the systems electrical schematic for connection details.The machine is designed for use in a controlled, dust and dirt-free environment, with operating temperatures and humidity comfortable for an Operator. See Section 1.2. Although designed and constructed to withstand even the most adverse of manufacturing atmospheres and demanding applications, this equipment is a very precisely adjusted, sensitive piece of machinery. Avoid unnecessary roughness during transportation and installation. Treat this equipment with care and attention.