The foundation beams are placed on expanded plasticrings which serve to seal off the anchor holes, and are thenaligned to the longitudinal and transverse axes in accordancewith the drawing. The anchor bolts are then tightened so as tobring the foundation beams to a point below their specifiedtheoretical height (see Fig. 1).