5. Work Procedure and Technical Requirements 5.1. Test preparation 5. Work Procedure and Technical Requirements5.1. Test preparation55. Work Procedure and Technical Requirements5.1. Test preparation5.2.2. Testing of Operating Mechanism of Circuit Breaker Check of Energy-storage Motor: Use the megameter to measure the insulation resistance of the motor; electrify the motor with the rated voltage and check the motor and the energy-storage motor and ascertain whether they can operate normally or not. Inspection of Five-prevention function of Vacuum Circuit Breaker: 1. When the circuit breaker is in the switch-on position, the handcart of the circuit breaker can’t be pulled out; 2. When the circuit breaker is in the testing position and switch-on state, the handcart of the locking circuit breaker should be pushed to the working position; 3. The circuit breaker can’t be switched on over the moving of the handcart of the circuit breaker; 4. As for the tripping prevention of the circuit breaker, it can be switched on for only once under one order; 5. The grounding switch can’t be turned on when the handcart of the circuit breaker is in the working position; 6. The handcart of the locking circuit breaker should be pushed to the working position when the grounding switch is on the switch-on state. When the circuit breaker is on the opening/closing status, check the control panel and indicating lamp that they should display correctly; When the grounding switch is on the opening/closing status, check the control panel and indicating position that they should display right. Check the minimum operation-voltage values of the switching-off and switching-on coils.5.2.3. Measuring insulation resistance.5.2.4. Measure the DC resistance of the conducting circuit of each phase.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
5.工作程序和技术要求<br>5.1。测试准备<br>5.工作程序和技术要求<br>5.1。测试准备<br>55.工作程序和技术要求<br>5.1。测试准备<br>5.2.2。断路器工作机理测试<br>检查储能电机:用万用表测量电机的绝缘电阻;用额定电压给电动机通电,检查电动机和储能电动机,确定它们是否可以正常工作。<br>真空断路器的五防功能检查:1.断路器处于合闸位置时,不能将断路器的手推车拉出;2.当断路器处于测试位置并处于接通状态时,应将锁定断路器的手推车推至工作位置;3.不能通过断路器手推车的移动来接通断路器;4.关于防止断路器跳闸,它只能以一个顺序接通一次;5.当断路器的手推车处于工作位置时,不能打开接地开关。6.当接地开关处于接通状态时,应将锁定断路器的手推车推至工作位置。<br>当断路器处于开合状态时,检查控制面板和指示灯是否正确显示;当接地开关处于打开/关闭状态时,检查控制面板并指示其应正确显示的位置。<br>检查断开和接通线圈的最小工作电压值。<br>5.2.3。测量绝缘电阻。<br>5.2.4。测量各相导电电路的直流电阻。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
5. Work Procedure and Technical Requirements <br>5.1. Test preparation <br>5. Work Procedure and Technical Requirements<br>5.1. Test preparation<br>55. Work Procedure and Technical Requirements<br>5.1. Test preparation<br>5.2.2. Testing of Operating Mechanism of Circuit Breaker<br> Check of Energy-storage Motor: Use the megameter to measure the insulation resistance of the motor; electrify the motor with the rated voltage and check the motor and the energy-storage motor and ascertain whether they can operate normally or not.<br> Inspection of Five-prevention function of Vacuum Circuit Breaker: 1. When the circuit breaker is in the switch-on position, the handcart of the circuit breaker can’t be pulled out; 2. When the circuit breaker is in the testing position and switch-on state, the handcart of the locking circuit breaker should be pushed to the working position; 3. The circuit breaker can’t be switched on over the moving of the handcart of the circuit breaker; 4. As for the tripping prevention of the circuit breaker, it can be switched on for only once under one order; 5. The grounding switch can’t be turned on when the handcart of the circuit breaker is in the working position; 6. The handcart of the locking circuit breaker should be pushed to the working position when the grounding switch is on the switch-on state.<br> When the circuit breaker is on the opening/closing status, check the control panel and indicating lamp that they should display correctly; When the grounding switch is on the opening/closing status, check the control panel and indicating position that they should display right.<br> Check the minimum operation-voltage values of the switching-off and switching-on coils.<br>5.2.3. Measuring insulation resistance.<br>5.2.4. Measure the DC resistance of the conducting circuit of each phase.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
5工作程序和技术要求<br>5.1条。试验准备<br>5工作程序和技术要求<br>5.1条。试验准备<br>55工作程序和技术要求<br>5.1条。试验准备<br>5.2.2条。断路器操动机构试验<br>检查储能电机:用兆欧表测量电机的绝缘电阻,用额定电压给电机通电,检查电机和储能电机是否能正常工作。<br>真空断路器五防功能检查:1。断路器在手拉位置时,断路器不能拔出。当断路器处于试验位置合闸状态时,应将闭锁断路器手车推到工作位置。断路器手车移动时不能合闸。对于断路器的防跳,一个命令下只能合闸一次。断路器手车处于工作位置时,接地开关不能合闸。当接地开关处于合闸状态时,应将闭锁断路器手车推到工作位置。<br>当断路器处于分、合闸状态时,应检查控制面板和指示灯是否正确显示;当接地开关处于分、合闸状态时,应检查控制面板和指示其正确显示的位置。<br>检查分合闸线圈的最小工作电压值。<br>5.2.3条。测量绝缘电阻。<br>5.2.4条。测量各相导电回路的直流电阻。
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.