Apart from the permanent concentrated loads from the 66kV and 22kV equipment, should we be allowing for any other load in the rooms? D&C has confirmed that the 10kPa live load is only applicable on the outside walkways between the buildings.If there are no additional load requirements (other than the concentrated loads) then the following evenly distributed loads will just be documented in the rooms: