5.1.Test preparation 5.1.1.The test staff is in place.5.1.2.Make detailed safety technical explanations to all test personnel before test.5.1.3.The tools and test equipment/instrument required for the test are prepared, and the measuring instruments used for the test are in good condition and qualified after verification.