Please confirm that different cable routes for between switchgear rooms, control room and pump house as specified, as only one cable route is found at this submission. 2. Please confirm that types of buried cable conduits as specified. 3. Please confirm the following as specified in Section 22.7.1, as:a. LV cables and control cables are separated from each other;b. MV cables are in single layers only;c. LV cables are installed at the next lower level from the higher level cables;d. The control cables are at the lowest levels of the cable routes;e. The C&I cables are to be separated from the power cable as required. 4. Please reconsider to put the air compressors and its accessories inside the pumping station indoor; 5. Please confirm, with design, to provide impressed current cathodic protection system from all pumps as specified in Particular Requirement - Section 20.11.3.8.