Please confirm that different cable routes for between switchgear room的简体中文翻译

Please confirm that different cable

Please confirm that different cable routes for between switchgear rooms, control room and pump house as specified, as only one cable route is found at this submission. 2. Please confirm that types of buried cable conduits as specified. 3. Please confirm the following as specified in Section 22.7.1, as:a. LV cables and control cables are separated from each other;b. MV cables are in single layers only;c. LV cables are installed at the next lower level from the higher level cables;d. The control cables are at the lowest levels of the cable routes;e. The C&I cables are to be separated from the power cable as required. 4. Please reconsider to put the air compressors and its accessories inside the pumping station indoor; 5. Please confirm, with design, to provide impressed current cathodic protection system from all pumps as specified in Particular Requirement - Section 20.11.3.8.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
请确认指定的开关柜室,控制室和泵房之间的电缆路径不同,因为在此提交中仅找到一条电缆路径。<br><br> <br><br>2.请确认埋入式电缆导管的类型符合规定。<br><br> <br><br>3.请确认以下,如第22.7.1规定,如:<br><br>一。低压电缆和控制电缆彼此分开;<br><br>b。中压电缆仅在单层中;<br><br>C。低压电缆安装在高等级电缆的下一层。<br><br>d。控制电缆位于电缆路径的最低层;<br><br>e。C&I电缆应根据需要与电源电缆分开。<br><br> <br><br>4.请重新考虑将空压机及其配件放入室内泵房内;<br><br> <br><br>5.请根据设计确认,按照特殊要求-第20.11.3.8节的规定,为所有泵提供外加电流阴极保护系统。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
Please confirm that different cable routes for between switchgear rooms, control room and pump house as specified, as only one cable route is found at this submission.<br><br> <br><br>2. Please confirm that types of buried cable conduits as specified.<br><br> <br><br>3. Please confirm the following as specified in Section 22.7.1, as:<br><br>a. LV cables and control cables are separated from each other;<br><br>b. MV cables are in single layers only;<br><br>c. LV cables are installed at the next lower level from the higher level cables;<br><br>d. The control cables are at the lowest levels of the cable routes;<br><br>e. The C&I cables are to be separated from the power cable as required.<br><br> <br><br>4. Please reconsider to put the air compressors and its accessories inside the pumping station indoor;<br><br> <br><br>5. Please confirm, with design, to provide impressed current cathodic protection system from all pumps as specified in Particular Requirement - Section 20.11.3.8.
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
请确认开关设备室、控制室和泵房之间的不同电缆路径符合规定,因为本次提交文件中仅发现一条电缆路径。<br>2。请确认埋地电缆管道的类型符合规定。<br>三。请确认第22.7.1节中规定的以下内容:<br>a、 低压电缆与控制电缆分开;<br>b、 中压电缆仅为单层;<br>c、 低压电缆安装在较高层电缆的下一层;<br>d、 控制电缆位于电缆线路的最底层;<br>e、 C&I电缆应按要求与电力电缆分开。<br>四。请重新考虑将空气压缩机及其附件置于室内泵站内;<br>5个。请确认,按照第20.11.3.8节的特殊要求,提供所有泵的外加电流阴极保护系统。
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.

Copyright ©2024 I Love Translation. All reserved.

E-mail: