Procedures Supplied by Tank SupplierThe Tank Supplier will provide the following procedures that will be included in the Field Erection package.Procedure for Checking of Concrete FoundationErection ProcedureProcedure for Dimensional Control of TankProcedure for Inner Tank Dimensional PlottingBase Insulation Installation ProcedureNon-Destructive Test Procedures