3.4.The test area is flat and clean, all the ditches and holes have been covered and the site lighting is enough.3.5.The field temporary test power supply is ready.3.6.First carry out the connection test of current transformer, voltage transformer, high-voltage fuse, vacuum circuit breaker, vacuum contactor, arrester and overvoltage protector in 10kV distribution device.