Work Description---------------------UPS A1 battery charger failure alarm, after the supplier’s on-site inspection and confirmation, the battery charging control board needs to be replaced.Power resource A to IT devices will be running on by-pass, shut down UPS A1, replace the battery charge control board. After completing UPS A1 maintenance, switch back to UPS power supply and resume power supply.