Please provide a clear overview explanation drawing on the cable tray routes including the positions where the section being cut for showing the cable tray arrangement;For the modification part on the cable route at CCB Pumping House/ Chlorination Building/ Pier side:· Please provide sufficient manholes in case cable conduits are applied to load the cables;· The cable loading capacity of the modified cable route are not less than the original route (route crossing MH#17/ MH#18), the trays or conduits in the new route are distinct for different categories of cable, and follow the distinction method used currently (say MV cable “M”, LV cable “P”, Alarm/Instrument/Control Cables “A”/ “I”/ “C”);· Please provide the section diagram regarding this part of trench/conduit/manhole;Please provide the section diagram for the route from 11/0.4kV transformer (PT980) to the trays shown in CHC01-S-EL-001-6001. The cable route connecting the CCB control building to 110kV substation cannot be applied in this project. B. CHC01-S-EL-001-6002-A:For Section J, it looks for us that the proposed trench of the used/existing tray cannot be accessible to the proposed route of Section C. Please relocate the new MV cables to Cable Tray M. If not, please justify.For Section C, please relocate the new MV cables to Cable Tray M. If not, please justify; C. Regarding CHC01-S-EL-001-6003/6004/6005-A:Please confirm that types of buried cable conduits as specified;The control cables are at the lowest levels of the cable routes as specified; D. Regarding CHC01-EL-001-6006-A:Please provide the physical location or indication to show where the proposed trench/ conduit structure will be applied;For Section 23, please place the control cables not in the same layer to the LV tray and be far away from the MV/LV power cable, and the control cables are to be placed in the lowest layer as specified;