After an oil or gas well is drilled, it is necessary to flow back any fluids used in treatment of the well.Traditional flow back and clean out operations using nitrogen via coil tubing are costly, require a large equipment footprint, and introduce safety and logistics risks and can often take up as much as 20% of the time it takes to drill the well.