Procedure A: Short Term Heat, Humidity and Cold Cycle1. Visuallyevaluate the part before the test. Note any defects on the component priorto testing.2. Measure the part and record the data at al specified locations at room temperature before cycling on theproduction support foundation or test fixture.Any visual defects/imperfections must benotedin thetest report and signed off by PD Engineering for compliance.3. Use test chambers with automated programmable test cycles for the listed test conditions beldNote that stages do not include ramp times to transition from leveltolevel. Each specimen can have different size,geometry,density, etc.which impacts ramp times;therefore,each transition period will vary in length of time4. Program the chamber as follows: