It was discovered that the position of the sub-reference pin was out of alignment during the customer acceptance inspection. In contrast to the finished product specification φ0.6, the case alone is specified as φ0.3 or less, but upper limit of the case specifications was affected by curing and NG occurred.As it was not included in the dimension inspection item, it was leaked to the customer.