2.The vendor shall confirm and take responsibility for the material selection of the wetted parts as per their engineering experience.55 3.The vendor shall confirm and take responsibility for the selection of the shaft seal as per their engineering experience.5657This document shall not be allowed to be disclosed to any other party without prior written consent of SNEI.4.Other parameters shall be determined by vendor in detailed design stage.