5.1.控制、测量、保护、信号回路检查和绝缘试验。5.1.1.按设计要求检查控制、测量、保护信号回路,电缆校对应准确无误,接线端子紧固,机械的简体中文翻译

5.1.控制、测量、保护、信号回路检查和绝缘试验。5.1.1.按设计要

5.1.控制、测量、保护、信号回路检查和绝缘试验。5.1.1.按设计要求检查控制、测量、保护信号回路,电缆校对应准确无误,接线端子紧固,机械部分检查良好。5.1.2.绝缘及耐压试验使用500V兆欧表测量,其绝缘电阻值应大于1MΩ,对地工频1000V耐压试验只对控制回路进行,持续时间1分钟;当回路5. Work Procedure and Technical Requirements5.1. Control, measurement, protection, signal circuit inspection and insulation test. 5.1.1. Check the control, measurement, and protection signal circuits according to the design requirements, the cable calibration is accurate, the wiring terminals are tight, and the mechanical parts are well checked. 5.1.2. The insulation and withstand voltage test is measured with a 500V megohmmeter, and the insulation resistance value should be greater than 1MΩ. The ground power frequency 1000V withstand voltage test is only performed on the control circuit, and the duration is 1 minute; when the circuit insulation resistance is greater than 10MΩ , It can be replaced by a 2500V megohmmeter. The duration is 1 minute. The 24V control circuit of the diesel engine control panel should not be subjected to a pressure test. 5.2. Device single component adjustment and setting test The corresponding control and protection parameters of the diesel engine intelligent controller are set by the diesel engine manufacturer and provided to the power plant for confirmation before it can be put into use. 5.3. Diesel generator set primary equipment handover test 5.3.1. Generator test; 5.3.2. Measuring the insulation resistance of the stator winding; 5.3.3. Measuring the DC resistance of the stator winding ; 5.3.4. Stator winding AC withstand voltage test; 5.3.5. Measure the phase sequence, the motor outlet terminal label should be consistent with the phase sequence; 5.3.6. Diesel generator outlet bus insulation test.
0/5000
源语言: -
目标语言: -
结果 (简体中文) 1: [复制]
复制成功!
5.1。控制,测量,保护,信号回路检查和绝缘试验。<br>5.1.1。按设计要求检查控制,测量,保护信号回路,电缆校对应准确无误,接线端子紧固,机械部分检查良好。<br>5.1.2 。绝缘及耐压试验<br>使用500V兆欧表测量,其绝缘电阻值应大于1MΩ,对地工频1000V耐压试验只对控制回路进行,持续时间1分钟;当回路5。工作程序和技术要求<br>5.1。控制,测量,保护,信号电路检查和绝缘测试。<br>5.1.1。根据设计要求检查控制,测量和保护信号电路,电缆校准是否准确,接线端子是否紧固以及机械零件是否经过良好检查。<br>5.1.2。绝缘和耐电压测试是<br>用500V兆欧表测量,绝缘电阻值应大于1MΩ。地面工频1000V耐压测试仅在控制电路上进行,持续时间为1分钟;当电路绝缘电阻大于10MΩ时,可用2500V兆欧表代替。持续时间为1分钟。柴油发动机控制面板的24V控制电路不应进行压力测试。<br>5.2。设备单件调整和设置测试<br>柴油机智能控制器的相应控制和保护参数由柴油机制造商设置,并提供给电厂进行确认,然后才能投入使用。<br>5.3。柴油发电机组一次设备交接测试<br>5.3.1。发电机测试;<br>5.3.2。测量定子绕组的绝缘电阻;<br>5.3.3。测量<br>定子绕组的直流电阻; 5.3.4。定子绕组交流耐压测试;<br>5.3.5。测量相序,电机出口端子标签应与相序一致;<br>5.3.6。柴油发电机出口母线绝缘测试。
正在翻译中..
结果 (简体中文) 2:[复制]
复制成功!
5.1.控制、测量、保护、信号回路检查和绝缘试验。<br>5.1.1.按设计要求检查控制、测量、保护信号回路,电缆校对应准确无误,接线端子紧固,机械部分检查良好。<br>5.1.2.绝缘及耐压试验<br>[500V],[1M],[1000V],[1];[5]。工作程序和技术要求<br>5.1. 控制、测量、保护、信号电路检查和绝缘测试。<br>5.1.1. 根据设计要求检查控制、测量和保护信号电路,电缆校准准确,接线端子紧闭,机械部件检查良好。<br>5.1.2. 绝缘和承受电压测试是<br>用 500V 电量计测量,绝缘电阻值应大于 1MΩ。地面功率频率1000V承受电压测试仅在控制电路上执行,持续时间为1分钟;当电路绝缘电阻大于10MΩ时,可用2500V电位计代替。持续时间为 1 分钟。柴油发动机控制面板的 24V 控制电路不应进行压力测试。<br>5.2. 设备单组件调整和设置测试<br>柴油机智能控制器的相应控制和保护参数由柴油机制造商设置,并提供给电厂确认后才能投入使用。<br>5.3. 柴油发电机组主设备交接试验<br>5.3.1. 发电机测试;<br>5.3.2. 测量子组绕组的绝缘电阻;<br>5.3.3. 测量直流电阻<br>子组缠绕;5.3.4. 起子器绕组交流承受电压测试;<br>5.3.5. 测量相位序列,电机出口端子标签应与相位序列一致;<br>5.3.6. 柴油发电机出口母线绝缘测试。
正在翻译中..
结果 (简体中文) 3:[复制]
复制成功!
5.1. Control, measurement, protection, signal circuit inspection and insulation test.<br>5.1.1. Check the control, measurement and protection signal circuits according to the design requirements, ensure that the cable alignment is correct, the wiring terminals are tight, and the mechanical part is in good condition.<br>5.1.2. Insulation and withstand voltage test<br>When 500V megger is used to measure, the insulation resistance value should be greater than 1m Ω. The 1000V withstand voltage test to ground power frequency is only carried out on the control circuit for 1 minute<br>5.1. Control, measurement, protection, signal circuit inspection and insulation test.<br>5.1.1. Check the control, measurement, and protection signal circuits according to the design requirements, the cable calibration is accurate, the wiring terminals are tight, and the mechanical parts are well checked.<br>5.1.2. The insulation and withstand voltage test is<br>measured with a 500V megohmmeter, and the insulation resistance value should be greater than 1MΩ. The ground power frequency 1000V withstand voltage test is only performed on the control circuit, and the duration is 1 minute; when the circuit insulation resistance is greater than 10MΩ , It can be replaced by a 2500V megohmmeter. The duration is 1 minute. The 24V control circuit of the diesel engine control panel should not be subjected to a pressure test.<br>5.2. Device single component adjustment and setting test<br>The corresponding control and protection parameters of the diesel engine intelligent controller are set by the diesel engine manufacturer and provided to the power plant for confirmation before it can be put into use.<br>5.3. Diesel generator set primary equipment handover test<br>5.3.1. Generator test;<br>5.3.2. Measuring the insulation resistance of the stator winding;<br>5.3.3. Measuring the DC resistance of the<br>stator winding ; 5.3.4. Stator winding AC withstand voltage test;<br>5.3.5. Measure the phase sequence, the motor outlet terminal label should be consistent with the phase sequence;<br>5.3.6. Diesel generator outlet bus insulation test.<br>
正在翻译中..
 
其它语言
本翻译工具支持: 世界语, 丹麦语, 乌克兰语, 乌兹别克语, 乌尔都语, 亚美尼亚语, 伊博语, 俄语, 保加利亚语, 信德语, 修纳语, 僧伽罗语, 克林贡语, 克罗地亚语, 冰岛语, 加利西亚语, 加泰罗尼亚语, 匈牙利语, 南非祖鲁语, 南非科萨语, 卡纳达语, 卢旺达语, 卢森堡语, 印地语, 印尼巽他语, 印尼爪哇语, 印尼语, 古吉拉特语, 吉尔吉斯语, 哈萨克语, 土库曼语, 土耳其语, 塔吉克语, 塞尔维亚语, 塞索托语, 夏威夷语, 奥利亚语, 威尔士语, 孟加拉语, 宿务语, 尼泊尔语, 巴斯克语, 布尔语(南非荷兰语), 希伯来语, 希腊语, 库尔德语, 弗里西语, 德语, 意大利语, 意第绪语, 拉丁语, 拉脱维亚语, 挪威语, 捷克语, 斯洛伐克语, 斯洛文尼亚语, 斯瓦希里语, 旁遮普语, 日语, 普什图语, 格鲁吉亚语, 毛利语, 法语, 波兰语, 波斯尼亚语, 波斯语, 泰卢固语, 泰米尔语, 泰语, 海地克里奥尔语, 爱尔兰语, 爱沙尼亚语, 瑞典语, 白俄罗斯语, 科西嘉语, 立陶宛语, 简体中文, 索马里语, 繁体中文, 约鲁巴语, 维吾尔语, 缅甸语, 罗马尼亚语, 老挝语, 自动识别, 芬兰语, 苏格兰盖尔语, 苗语, 英语, 荷兰语, 菲律宾语, 萨摩亚语, 葡萄牙语, 蒙古语, 西班牙语, 豪萨语, 越南语, 阿塞拜疆语, 阿姆哈拉语, 阿尔巴尼亚语, 阿拉伯语, 鞑靼语, 韩语, 马其顿语, 马尔加什语, 马拉地语, 马拉雅拉姆语, 马来语, 马耳他语, 高棉语, 齐切瓦语, 等语言的翻译.