Shore Line / Slope Protection is belongs to leveling work. Leveling work, Break water, break sand and Dredging for Turning basin area &Navigation Channel shall be local portion. P2 will prepare the Method statement of Leveling work and submit in the proposal.Deviation shall be prepared."