Line shall enter inner tank shell just below the maximum liquid level and project upwards inside the tank to the maximum liquid level (see Figure 1).Line Slope:Line shall be continuously sloped toward the outer tank penetration with a minimum slope of 1 in 4.External termination: per Figure 5.Local Inner and Outer Tank Penetrations Schedule:See Section 3.7 and PES.