The tank vendor shall supply foundation loading data to Air Products based on the vendor’s design in order to complete the foundation design.3.2.7The governing wind code(s) and all inputs specific to the tank’s place of operation (importance factor, site class, wind speed, etc.) shall be as specified in the PES.3.2.8The governing seismic code(s) and all inputs specific to the tank’s place of operation (importance factor, site class, accelerations, etc.) will be communicated to the tank fabricator and erector in the PES.