After completion of hydro-pneumatic test, cut the manway neck (using a saw)Carry out final internal inspection of the tankMake edge preparation (groove) on manway neck.Tack weld backing strip into manway neck with drainage slot (minimum opening width) at the bottomLocate dished headMake closure butt weld – Joint 2