As we are required to set BI Chamber in line of Assembly Main Line inside a clean environment (reference to ISO 8 grade), we need some more specification information of JetTest BI Chamber to check & validate. Please provide detail specification :-Do Fresh Air intakes can be connected to plant Fresh Air supply system via ducting? If yes, what is the duct connection size, Fresh air flow volume (max / average)?Noise level of the JetTest 72KW BI Chamber at 1M around the chamber?The surface temperature at 6 sides (Top / Left / Right / Back /Front Door) while the BI Chamber operating at full load condition and of the BI temperature setting at 45’C.Any additional options that JetTest recommend to add to the BI Chamber to enable the BI chamber to be installed in line of Assembly Main Line inside a clean environment (reference to ISO 8 grade)?