The calculations have been presented in a conservative way, but two additional factors should be considered.If the machine or system relies to an operator feeding or discharging the line, the productivity will have to consider the efficiency of the operator.We assumed the line producing 100% good parts: if the line is less efficient, the percentage of scrap will reduce the calculated efficiency of the line.