4. Work Flow Chart of Erection Sequence4.1prerequisite: the diesel generator has been installed in place and the cleaning work has been completed.4.2 List of main test instruments4.3 Requirement: All test instruments shall be calibrated valid. No. Testing instrument name Type Qty.1 Megameter BCM5033-5000V 12 AC testing transformer JY6611 1