we have a container for storing all PF pipe and accessories on the NO.10 CH middle hatch cover. GF team job scope is installing all PE pipe above upper deck and modules. and the modules are not install on board which stay on the floor at SY docking side, we need transfer related PE pipe and materials to modules to start the work. that day, they are also need PE pipe DN150 for ME process tank air vent. drawing: EGCS-1835-WD-5110-01(E).