In order to guide the construction personnel to carry out correct construction and ensure safe production and civilized construction, the construction scheme is specially prepared. This construction scheme is applicable to the on-site commissioning of thermal control system in C2 bid section of Vietnam coastal phase II 2 × 660MW coal-fired power plant project, mainly including meter calibration, local equipment commissioning, loop commissioning, thermal control power supply system, etc.