7.3.6.In stormy weather, stop all work at high places. Rainy days, fog must work, to do a good job of rain, slip and shock prevention measures; shutdown must stop the construction of electricity. When cannot stop work, electrician must follow shift and use electricity dish to undertake circuit inspection to line and construction.The engineering company shall timely consult the site safety department about the weather conditions so as to reasonably arrange the construction and adjust the operation plan