If the re-inspection results are inside the specification / receiving inspection control form limits, a Supplier QCR (register as an “Internal issue”) is filled out for the batch and it is approved for shelf life extension according to table above by the Plant Quality. If the test results are out of the specification / receiving inspection control limits, they must be verified according to CI-00369 (Decision Matrix - Quality Control) in order to decide how the QCR must be disposed: by Plant Quality or by Materials Qualification and Technology team. The QCR is handled according to the Handle Raw materials/Parts Non-conformity procedure, which is found in the Business Management System at the LM intranet.