Any overdimensioned items must be adapted and fit as appropriate prior to assembly. All lifting lugs pointing to the foundation slabs must be removed before the casing end walls are positioned so that the necessary axial clearance is not obstructed.
Any overdimensioned items must be adapted and fit as appropriate prior to assembly. All lifting lugs pointing to the foundation slabs must be removed before the casing end walls are positioned so that the necessary axial clearance is not obstructed.