It is allowed to refer the receiving inspection results of the same batch received in a different plant or earlier in the same plant and skip the receiving inspection if delivery conditions have fulfilled specifications. However, for liquid materials, whenever shelf life requirements are not met as per specification, the receiving inspection testing shall be performed, even when same batch could have been tested and approved in other plants (this is due to the drift in chemical properties over time).